Milksteakboiledhard
Distinguished Member
- Joined
- Jun 22, 2017
- Messages
- 1,162
- Reaction score
- 4,080
Two items on my vent list this morning:
- I have an electric mower with 3 batteries. Each mowing takes between 75-100% of a charge, but when I push rather than use the self-propelled motor I can get done with 40% left of the largest battery. I thought it would be a good idea to cycle through all my batteries the last time I mowed and tried to kill them all so I could give them a fresh charge. Today I pulled a battery off the charger only to realize I never plugged in the charger. Three batteries all with ~25% charge. Thats what I get for being a self-landscaper.
- I had a work project dumped on me because the resource originally staffed on the project was travelling and the client wanted to move a phase 2 item into immediate Go Live mode. Took 2 days to get their availability to schedule a kick-off call for yesterday afternoon. The only client-side resource was a junior project manager with no experience or insight on the topic. So the hour long call that was urgent for last week will need to be ran through a second time next week.