- Joined
- Nov 21, 2008
- Messages
- 28,515
- Reaction score
- 30,314
We are building using ICF (insulated concrete forms), so its pretty important that we get someone good for that. There are also a **** load of windows, but I would hire subs for everything and just cut out the GC and his cost + 15% pricing. I absolutely think I could do it, but our "dream home" might not be the one to try it on...
I guess that's my point. If it was me the analysis would be: if I hire the GC, will it mean I can't afford my dream house, so I would need to compromise. If yes, would that compromise be something I could live with: either not finishing everything at once or giving up a feature/finish/size? Will the inevitable delays in construction cost me something, and how does that estimated cost compare to the cost of the GC. Etc.