I could build The Great Pyramid of Giza, using my techniques and primitive tools. On a twenty-five year construction schedule, (working forty hours per week at fifty weeks per year, using the input of myself to calculate) I would need a crew of 520 people to move blocks from the main quarry to the site and another 100 to move the blocks on site. For hoisting I need a crew of 120 (40 working and 80 rotating). My crew can raise 7000 lb. 100 ft. per minute. I have found the design of the pyramid is functional in it’s own construction. No external ramp is needed.
Styleforum › Forums › General › General Chat › Dude Figures Out How the Pyramids and Stonehenge Were Constructed
Dude Figures Out How the Pyramids and Stonehenge Were Constructed
post #2 of 15
8/29/11 at 12:36am
post #3 of 15
8/29/11 at 2:03am
post #4 of 15
8/29/11 at 6:55am
post #5 of 15
8/29/11 at 11:11pm
post #6 of 15
8/29/11 at 11:39pm
post #7 of 15
8/30/11 at 12:43am
post #8 of 15
9/1/11 at 7:35pm
post #9 of 15
9/3/11 at 9:43pm
post #10 of 15
9/4/11 at 11:56am
post #11 of 15
9/5/11 at 10:46am
post #12 of 15
9/5/11 at 11:34am
post #13 of 15
9/5/11 at 12:31pm
post #14 of 15
9/6/11 at 9:38am
post #15 of 15
9/6/11 at 10:02am
Styleforum › Forums › General › General Chat › Dude Figures Out How the Pyramids and Stonehenge Were Constructed







![nod[1].gif](http://files.styleforum.net/images/smilies/nod%5B1%5D.gif)



